History
KumbaK was founded in 2001 as KumbaK Coasters. The original mission was to provide completely new attractions to our clients. However, in 2009, the focus of the company was shifted from developing new roller coasters to providing specialized engineering services, the upgrading of older roller coasters, the reverse engineering of replacement parts and the development of safety products as main product lines. Since then we are known as KumbaK ‑ The Amusement Engineers.

Wooden Coaster
Client: PNE, Vancouver CA-BC
Product Category: Standard Safety Products
Description: Supply and integration of Locked-and-Monitored Seatbelt systems to be added as secondary restraint system.
2022Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Standard Safety Products
Description: Supply of Locked-and-Monitored Seatbelt systems to be used as primary restraint system of a major new attraction.
2021Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Replacement Parts
Description: Completion of the step-by-step replacement of the wheel carriers of a major water ride.
2019Viking Voyage
Client: Wild Adventures, US-GE
Product Category: Standard Safety Products
Description: Supply and integration of Locked-and-Monitored Seatbelt systems to be added as secondary restraint system.
2018Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Specialized Engineering
Description: Development and realization of Show Action Equipment for a major new attraction.
2018Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Standard Safety Products
Description: Supply of Locked-and-Monitored Seatbelt systems to be used as primary restraint system of a major new attraction.
2018Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Standard Safety Products
Description: Development and supply of Locked-and-Monitored Seatbelt systems to be used as the primary restraint system of a major new attraction.
2017Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Ride Upgrade
Description: Development and realization of a ride evacuation system for a major attraction.
2016T3
Client: Kentucky Kingdom, Louisville US-KY
Product Category: Ride Upgrade
Description: Upgrade trains with new hangers, having an improved seating configuration and class-5 restraint systems, and a new magnetic (eddy current) brake system.
2015RoboCoaster
Client: Simworx, Kingswinford UK
Product Category: Specialized Engineering
Description: Development and supply of a four-passenger light-weight seating unit.
2014Zodiac
Client: Thorpe Park, Londen UK
Product Category: Standard Safety Products
Description: Supply and integration of Locked-and-Monitored Seatbelt systems to be added as secondary restraint system.
2014Ride not to be disclosed
Client: Client not to be disclosed
Product Category: : Ride Upgrade
Description: Chassis replacement for all ride vehicles of a major attraction.
2013Arkham Asylum – Shock Therapy
Client: WBMW Australia, Oxenford AU-QL
Product Category: Ride Upgrade
Description: Upgrade trains with new hangers, having an improved seating configuration and class-5 restraint systems, and a new magnetic (eddy current) brake system.
2012Rutschebanen
Client: Dyrehavsbakken, Klampenborg DK
Product Category: Ride Upgrade
Description: Complete upgrade of the ride with three new trains, a magnetic (eddy current) braking system and ride control system.
2010Sea Viper
Client: Sea World, Surfers Paradise AU-QL
Product Category: Ride Upgrade
Description: Completion of the step-by-step upgrading of the train.
2009Hornet
Client: Wonderland Park, Amarillo US-TX
Product Category: : Ride Upgrade
Description: Upgrade with a new ride control system.
2008Robin Hood
Client: Walibi Holland, Biddinghuizen NL
Product Category: Standard Safety Products
Description: Replacement of the original restraint systems with new class-5 systems.
2010Vienna Airlines
Client: Lilis Welt, Vienna AT
Product Category: Specialized Engineering
Description: Development and realization of this new stand-up motion platform.
2008Miraculum
Client: Lilis Welt, Vienna AT
Product Category: Specialized Engineering
Description: Development and realization of this new 5D-theatre.
2008Monkey Rail
Client: Ouwehands Dierenpark, Rhenen NL
Product Category: Ride Upgrade
Description: Modification to the wheel carriers to allow continued operation.
2008Tomahawk
Client: PortAventura, Salou ES
Product Category: Ride Upgrade
Description: Upgrade with a new magnetic (eddy current) braking system and ride control system.
2007Stampida
Client: PortAventura, Salou ES
Product Category: Ride Upgrade
Description: Upgrade with four new trains, a new magnetic (eddy current) braking system and ride control system.
2006Phantom's Revenge
Client: Kennywood, West Mifflin US-PA
Product Category: Ride Upgrade
Description: Development and realization of a new magnetic (eddy current) braking system and ride control system.
2006Grand National
Client: Blackpool Pleasure Beach, Blackpool GB
Upgrade Category: New Ride
Description: Development and realization of a new magnetic (eddy current) braking system and ride control system.
2005Wereld 3 Stalen Monsters
Client: Spoorwegmuseum, Utrecht NL
Product Category: Specialized Engineering
Description: Realization of a dark ride which was custom designed for the museum, including two turntables and a three meter vertical drop.
2005Space Invader 2
Client: Blackpool Pleasure Beach, Blackpool GB
Product Category: Ride Upgrade
Description: Complete upgrade of the ride with eight new ride vehicles, a magnetic (eddy current) braking system, lift drive system, ride control system and new track sections in uncomfortable areas.
2004Ride not to be disclosed
Client: Client not to be disclosed
Product Category: Ride Upgrade
Description: Development and realization of a new drive shaft, split-sprocket and in-situ replacable bearings for the lift drive system of a major water ride.
2003Great Nor Easter
Client: Morey's Piers, Wilwood US-NJ
Product Category: Ride Upgrade
Description: Development and realization of a evacuation device running along the lift hill and a passenger evacuation platform at the top of the lift to allow evacuation of the guests. In addition, the system is used as a maintenance device, facilitating the replacement of the lift lining and other inspection and maintenance work.
2003